Student Work

Russia’s Next Generation Railcars

Public

Downloadable Content

open in viewer

Brunswick Rail must replace nearly 8,000 railcars as they reach the end of their service life, with either existing standard railcars or New Generation Railcars (NGRs). Russia’s railcar fleet as a whole faces a similar dilemma. We determined the potential effects of NGRs on railcar leasing by conducting a cost-benefit analysis and through discussions with industry experts. While NGRs could be beneficial to the rail industry, Brunswick Rail will find purchasing these railcars difficult due to the current economic environment.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Subject
Publisher
Identifier
  • E-project-102715-154316
Keyword
Advisor
Year
  • 2015
Center
Sponsor
Date created
  • 2015-10-27
Location
  • Moscow
Resource type
Rights statement

Relations

Items

Items

Permanent link to this page: https://digital.wpi.edu/show/gf06g339f