Student Work

Highway Bridge Redesign

Public

Downloadable Content

open in viewer

The goal of this MQP was to analyze different possible replacement strategies for a specific highway bridge to design the most easily implementable and efficient replacement. Design of the bridge elements was completed in accordance with the AASHTO LRFD Bridge Specification and was aided by the use of software. The final presentation included a structural design of the selected superstructure and substructure with accompanying construction and traffic planning, as well as a cost estimate of direct and indirect costs.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • E-project-042313-200003
Advisor
Year
  • 2013
Date created
  • 2013-04-23
Location
  • Osaka
Resource type
Major
Rights statement

Relations

In Collection:

Items

Items

Permanent link to this page: https://digital.wpi.edu/show/g445cf683