Operator Touch Time Analysis at Skyworks Solutions Inc.
PublicDownloadable Content
open in viewerThe main objective of this Major Qualifying Project was to minimize the non-value added time of operators inside the metals area of the fab at our sponsor, Skyworks Solutions Inc. The methods used to achieve our goal were axiomatic design, time studies, labor studies, and an engineering financial analysis. Through these methods we identified non-value added steps in current procedures inside the fab that could be minimized. We recommended possible alternatives for saving time in the fab and its feasibility was studied through an engineering economic analysis that showed the possible savings that will yield more productivity inside the fab.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Publisher
- Identifier
- E-project-120916-122702
- Advisor
- Year
- 2016
- Sponsor
- Date created
- 2016-12-09
- Resource type
- Major
- Rights statement
Relations
- In Collection:
Items
Items
Thumbnail | Title | Visibility | Embargo Release Date | Actions |
---|---|---|---|---|
Skyworks_MQP_Final_Project.pdf | Public | Download |
Permanent link to this page: https://digital.wpi.edu/show/8w32r7058