Student Work

Gateway Building 2012: Alternative Designs and Use of Building Information Modeling

Public

Downloadable Content

open in viewer

This project proposes two alternative designs of the structural frame of the Gateway Park Phase II using a cast-in-place concrete sway frame and a redesign of the existing steel building to incorporate lateral bracing. The work flow and design process incorporated modern Building Information Modeling (BIM) tools, for which the logistics of interoperability were explored and documented. The programs utilized were Scia Engineer, Revit Structures, Revit Architecture, and Robot.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • E-project-042612-105629
Advisor
Year
  • 2012
Date created
  • 2012-04-26
Location
  • Worcester
Resource type
Major
Rights statement

Relations

In Collection:

Items

Items

Permanent link to this page: https://digital.wpi.edu/show/pr76f519r