National Grid Estimated Time of Restoration Model
PublicDownloadable Content
open in viewerThis project was a joint effort between National Grid and our project team to develop a single model to calculate estimated time of restoration for both pre and post storm. A database containing storm dates, a severity indicator, crew hours, and customers interrupted was developed. This database was used to determine crew hour requirements based on storm severity predicted forecasts and based on actual customer interrupted provided by PowerOn.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Publisher
- Identifier
- E-project-032508-103649
- Advisor
- Year
- 2008
- Sponsor
- Date created
- 2008-03-25
- Resource type
- Major
- Rights statement
Relations
- In Collection:
Items
Items
Thumbnail | Title | Visibility | Embargo Release Date | Actions |
---|---|---|---|---|
NGMQP_2008.pdf | Public | Download | ||
National_Grid_ETR_Model.xls | Public | Download |
Permanent link to this page: https://digital.wpi.edu/show/tt44pp30r