Faculty Advisor

Thompson, Robert W.

Faculty Advisor

Vernon-Gerstenfeld, Susan

Center

Worcester, MA

Abstract

The goal of the project was to establish and evaluate the problems in Worcester County's wastewater and investigate what was being done to remedy the situation. Through many means of data collection: first hand interviews, budget analysis, and government document collection, we discovered key areas that are responsible for causing the problems Worcester County is facing. We concluded that there are two main issues from which all the problems in wastewater treatment stem. Budget cutbacks and labor shortages are crippling the MassDEP and EPA. All problems with the procedures and equipment in the environmental strike force can be traced back to these issues.

Publisher

Worcester Polytechnic Institute

Date Accepted

March 2007

Project Type

Interactive Qualifying Project

Accessibility

Unrestricted

Advisor Department

Chemical Engineering

Advisor Department

Interdisciplinary Programs

Project Center

Worcester, MA

Share

COinS