Faculty Advisor

FitzPatrick, Malcolm

Faculty Advisor

Salazar, Guillermo F.

Center

London, England

Abstract

The London Borough of Merton (LBM) has determined that a pyrolysis combined heat and power (CHP) plant has the potential to supply local sites with inexpensive heating and electricity while eliminating waste and reducing overall CO2 emissions. The objective of this project was to investigate the most effective route for heat and power distribution from the Willow Lane Industrial Estate to the Canons Leisure Centre based on economic, technical, environmental, and social considerations. This route assessment will guide the LBM in their implementation of a CHP distribution network.

Publisher

Worcester Polytechnic Institute

Date Accepted

April 2005

Project Type

Interactive Qualifying Project

Accessibility

Unrestricted

Advisor Department

Civil and Environmental Engineering

Share

COinS