Student Work

Holy Name High School Wind Feasibility Study

Public

Downloadable Content

open in viewer

The objective of this IQP was to facilitate the eventual construction of a wind turbine at Holy Name High School. A feasibility study based upon the economic and social issues surrounding such a project will be presented, including documentation of the additional steps taken by the group regarding conferences, meetings and presentations to help secure a wind turbine for Holy Name. Our results conclude that it would be feasible for Holy Name to erect a 600 kW turbine on site.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Subject
Publisher
Identifier
  • E-project-121306-104131
Keyword
Advisor
Year
  • 2006
Sponsor
Date created
  • 2006-12-13
Location
  • Worcester
Resource type
Rights statement

Relations

Items

Items

Permanent link to this page: https://digital.wpi.edu/show/xk81jk84c