Student Work
Holy Name High School Wind Feasibility Study
PublicDownloadable Content
open in viewerThe objective of this IQP was to facilitate the eventual construction of a wind turbine at Holy Name High School. A feasibility study based upon the economic and social issues surrounding such a project will be presented, including documentation of the additional steps taken by the group regarding conferences, meetings and presentations to help secure a wind turbine for Holy Name. Our results conclude that it would be feasible for Holy Name to erect a 600 kW turbine on site.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Subject
- Publisher
- Identifier
- E-project-121306-104131
- Keyword
- Advisor
- Year
- 2006
- Sponsor
- Date created
- 2006-12-13
- Location
- Worcester
- Resource type
- Rights statement
Relations
- In Collection:
Items
Permanent link to this page: https://digital.wpi.edu/show/xk81jk84c