Faculty Advisor

Trimbur, John.

Abstract

This project was commissioned by the London borough of Merton in order to execute preliminary steps of a resident consultation process on High Path Estate as a stage in the implementation of a combined heat and power system. In designing, administering and evaluating the survey and interview portions of the consultation, several site-specific issues were highlighted, but the process intent was to be replicable elsewhere as part of installing a sustainable energy system.

Publisher

Worcester Polytechnic Institute

Date Accepted

January 2005

Project Type

Interactive Qualifying Project

Accessibility

Restricted-WPI community only

Advisor Department

Humanities and Arts

Share

COinS