Student Work

Nantucket Buildout Analysis

Public

Downloadable Content

open in viewer

The goal of this project was to perform a buildout analysis for the Town of Nantucket that could inform the Master Plan in 2020/2021. - The analysis is based off current zoning, wetlands, and other land use criteria. - To realize this goal, the team acquired the town’s assessor, GIS, and building permit data. - This data was analyzed using Microsoft Excel and ArcGIS Pro. The tables, maps, and graphs produced from the data resulted in the current day depiction of residential dwellings and parcels and three different buildout scenarios: a hypothetical maximum residential buildout scenario, a high residential dwelling growth scenario for 2030, and a low residential dwelling growth scenario for 2030.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Subject
Publisher
Identifier
  • E-project-121318-173047
Keyword
Advisor
Year
  • 2018
Center
Sponsor
Date created
  • 2018-12-13
Location
  • Nantucket
Resource type
Rights statement

Relations

Items

Items

Permanent link to this page: https://digital.wpi.edu/show/sn009z284