Student Work

Investigation into Reliability of the Jubilee Line

Public

Downloadable Content

open in viewer

Metro systems are often faced with reliability issues; specifically pertaining to safety, accessibility, train punctuality, and stopping accuracy. The project goal was to assess the reliability of the London Underground’s Jubilee Line and the systems implemented during the Jubilee Line extension. The team achieved this by interviewing train drivers and Transport for London employees, surveying passengers, validating the stopping accuracy of the trains, measuring dwell times, observing accessibility and passenger behavior on platforms with Platform Edge Doors, and overall train performance patterns.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Subject
Publisher
Identifier
  • E-project-042717-142011
Keyword
Advisor
Year
  • 2017
Center
Sponsor
Date created
  • 2017-04-27
Location
  • London
Resource type
Rights statement

Relations

Items

Items

Permanent link to this page: https://digital.wpi.edu/show/v979v364x