Warehouse Redesign for Bay State Milling Corp.
PublicDownloadable Content
open in viewerThe goal of the project was to increase the efficiency of BSMs inventory management system at their Clifton Facility. The team evaluated the procedures, diagnosed the problems, and built recommendations to address their problems. Through the provided data and observation, we discovered their current inventory layout inefficient for their inventory flow system, that the current policy regarding customer practices was too lenient, and that BSM does not collect metrics regarding inventory movement. We then developed short term, intermediate and, long term recommendations to combat the problems we identified.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Contributors
- Publisher
- Identifier
- E-project-011411-141854
- Advisor
- Year
- 2011
- Sponsor
- Date created
- 2011-01-14
- Resource type
- Major
- Rights statement
Relations
- In Collection:
Items
Permanent link to this page: https://digital.wpi.edu/show/cn69m566s