Faculty Advisor

Rong, Yiming

Center

Wuhan, China

Abstract

The goal of this project was to make recommendations to improve for Amphenol TCS according to the principle of lean manufacturing. The primary objective was to improve the quality as well as productivity of the GBX production system. From gathering data and verification, a set of recommendations was created on how Amphenol TCS can optimize the operation of manufacturing floor.

Publisher

Worcester Polytechnic Institute

Date Accepted

August 2007

Major

Mechanical Engineering

Project Type

Major Qualifying Project

Accessibility

Unrestricted

Advisor Department

Mechanical Engineering

Share

COinS