The Major Qualifying Project was completed for Stantec. The project analyzed the construction plans for the Boston Children's Hospital Addition in Brookline, Massachusetts and designed possible alternatives for these plans. Cut-and-fill calculations were completed that considered the contaminated soils on site. Three alternative plans were developed that altered duration, costs, soil reuse, and phasing start dates. These plans were then evaluated using a weighted decision matrix. The provided recommendation focused on maximizing efficiency of project cost and time.