Layout Improvement and Tool Change Optimization at Primetals

Public

Downloadable Content

open in viewer

The objective of this Major Qualifying Project (MQP) was: to reduce setup and tool changeover times for products machined at Horizontal Machining Center 6 (HMC6), and to evaluate and improve the layout and flow of the Manufacturing Assembly Area 71 (A71M). The methods used include observations and interviews, axiomatic design, lean manufacturing, and linear programming. The team concluded that Primetals Technologies (Primetals) could more efficiently change tools on HMC6 and can save time on part assemblies at A71M. A financial analysis of the report showed that lean implementation can save Primetals roughly $12,000 - $22,000 annually, and an optimized tool changeover process can save Primetals $57,000 - $126,000 per year.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • E-project-022618-100326
Advisor
Year
  • 2018
Sponsor
Date created
  • 2018-02-26
Resource type
Major
Rights statement

Relations

In Collection:

Items

Items

Permanent link to this page: https://digital.wpi.edu/show/bg257g786