Student Work

Supply Chain Management of Tri-modal Sensor

Public

Downloadable Content

open in viewer

The objective of this project is to analyze a supply chain designed to provide a prototype electronic system with multiple companies involved. The rationale for this project is that integrating multiple companies’ products and intellectual property to produce a new prototype which produces a new set of functionalities incorporates many types of risk. These risks include, but are not limited to, compatibility of technology, scheduling, cost overrun, and viability of the delivered prototype system. Results indicate that the risks can be managed to ensure successful fulfilment of the prototype production. A main conclusion is that project management that includes scheduling and risk analysis greatly reduces the risk of prototype delivery failure.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Contributors
Publisher
Identifier
  • E-project-090514-091405
Advisor
Year
  • 2014
Sponsor
Date created
  • 2014-09-05
Resource type
Major
Rights statement
Last modified
  • 2023-12-05

Relations

In Collection:

Items

Items

Permanent link to this page: https://digital.wpi.edu/show/2z10wr63d