Faculty Advisor

Rong, Yiming

Center

Wuhan, China

Abstract

The project analyzes the current practices of Stanlok/REM and suggests means by which this corporation can increase global collaboration through the application of web-based engineering tools. Research was conducted in the field of software design, focusing on the communication between Java and SQL, along with preliminary study of relational databases. Proposed software was designed and implemented creating a server-based software tool which allows employees from any location to access and manage a manufacturing cost estimation dataset and deliver real-time simultaneous cost calculation.

Publisher

Worcester Polytechnic Institute

Date Accepted

August 2010

Major

Mechanical Engineering

Project Type

Major Qualifying Project

Accessibility

Unrestricted

Advisor Department

Mechanical Engineering

Project Center

Wuhan, China

Share

COinS