Student Work

Pedestrian Bridge Design and Institute Park Improvements

Public

Downloadable Content

open in viewer

This capstone project investigated various pedestrian bridge design alternatives to span Salisbury Pond in Institute Park and proposed other critical park improvements. Three bridge alternatives were considered including a truss, arch, and cable-stayed design. Each of the three design alternatives were analyzed using a comparative chart which included rating criteria such as economics, constructability, and environmental impact. The arch bridge was identified to best serve the design challenges at Institute Park, and the details of the structure were used to compile a final cost estimate. Along with the bridge design, other park amenity improvements were investigated with associated costs, and a final design package was created.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • E-project-032117-230330
Advisor
Year
  • 2017
Date created
  • 2017-03-21
Resource type
Major
Rights statement

Relations

In Collection:

Items

Items

Permanent link to this page: https://digital.wpi.edu/show/m326m307h