Faculty Advisor

Hart, Frederick L.

Faculty Advisor

LePage, Suzanne

Center

Stantec-Boston, Massachusetts

Abstract

This Major Qualifying Project was completed in conjunction with Stantec to design upgrade options to increase septage treatment capacity at the Pease Wastewater Treatment Plant in Portsmouth, NH. Designs modernized existing technologies and suggested methods to treat glycol waste. Following a site visit, data analysis, design alternative development, and cost estimates, designs were scored in health and safety, environmental and sustainability, economic, and constructability criteria. This project proposes one short-term and one long-term design to resolve existing and future problems.

Publisher

Worcester Polytechnic Institute

Date Accepted

March 2016

Major

Environmental Engineering

Major

Civil Engineering

Project Type

Major Qualifying Project

Accessibility

Unrestricted

Advisor Department

Civil and Environmental Engineering

Advisor Program

Civil and Environmental Engineering

Project Center

Stantec-Boston, Massachusetts

Share

COinS