Student Work

The Effects of Hole Cleaning on Post-Installed Anchor Systems in Concrete

Public

Downloadable Content

open in viewer

This project aimed to confirm the relationship between installation technique and anchor performance according to HILTI specifications. Controlled testing was performed in order to collect sufficient data to accurately determine a relationship. Testing results were used to predict anchor performance and impact of installation errors.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Contributors
Publisher
Identifier
  • E-project-042808-114503
Advisor
Year
  • 2008
Sponsor
Date created
  • 2008-04-28
Resource type
Major
Rights statement

Relations

In Collection:

Items

Items

Permanent link to this page: https://digital.wpi.edu/show/h989r459h