Student Work

Fish Passage Restoration in East Hampton, Massachusetts

Public

Downloadable Content

open in viewer

This project delivers a complete design report showing a number of options for the Northampton Street Dam to be presented to the United States Fish and Wildlife Service. Included in the report is a characterized list of the designs considered in order of best fit. The engineering behind the designs is also mathematically shown and displayed in conceptual AutoCAD images. This includes a hydraulic analysis of the Northampton Street Dam to determine the river operating heights and if modifications of the dam would alter present flow conditions. Each design also has a cost analysis section that is based on 2007-2008 expected pricing guides.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • E-project-042507-233000
Advisor
Year
  • 2007
Sponsor
Date created
  • 2007-04-25
Resource type
Major
Rights statement
Last modified
  • 2021-01-07

Relations

In Collection:

Items

Items

Permanent link to this page: https://digital.wpi.edu/show/5138jg344