Abstract

This project proposes a combine shallow and deep foundation design for the construction of a new integraded parking garage and athletic field structure for Worcester Polytechnic Institute (WPI). It mainly focuses on the foundations design of the building and on the construction planning and Project Management, using of the traditional schedule with the Critical Path Method. The project also develops a Building Information Modeling (BIM) digital 3D model and extends it to a 5D model for integration of time and cost.