Student Work

Construction Management and Foundation Designs for WPI Athletic Rooftop Parking Garage

Public

Downloadable Content

open in viewer

This project tracks the schedule and cost of the new WPI athletic rooftop parking structure as observed during construction and develops a 5D model (3D plus time and cost dimensions) of this process using Building Information Modeling tools and techniques. This project also designs a foundation system that includes a combination of deep and shallow structural foundations for the parking garage with an athletic rooftop.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • E-project-041813-153309
Advisor
Year
  • 2013
Sponsor
Date created
  • 2013-04-18
Location
  • Worcester
Resource type
Major
Rights statement

Relations

In Collection:

Items

Items

Permanent link to this page: https://digital.wpi.edu/show/m326m321b