Student Work

Edwards Pond Dam Removal Study

Public

Downloadable Content

open in viewer

This project will investigate the feasibility of removing a small earthen dam as well as an analysis of the processes involved. This project will focus on the hydrological and environmental impacts of dam removal, and will also include cost and permitting considerations. This project will be dealing specifically with the dam at Edwards Pond in West Boylston, MA.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • E-project-031610-090243
Advisor
Year
  • 2010
Date created
  • 2010-03-16
Resource type
Major
Rights statement
Last modified
  • 2021-01-07

Relations

In Collection:

Items

Items

Permanent link to this page: https://digital.wpi.edu/show/j098zc65h