Faculty Advisor

Johnson, Sharon A.

Abstract

A simulation model was developed to determine the optimal number of trailer inbound parking spaces needed at the Hartford Hub facility of RPS, Inc., in Willington, Connecticut, which is expanding significantly. The final model can also be implemented at the other RPS hubs across the country.

Publisher

Worcester Polytechnic Institute

Date Accepted

January 2000

Major

Industrial Engineering

Major

Management Engineering

Project Type

Major Qualifying Project

Accessibility

Restricted-WPI community only

Advisor Department

Business

Share

COinS