Faculty Advisor

Zhu, Joe

Abstract

The objective of this project was to propose improvements for data collection and analysis at the in-process inspection workstation of Bunzi Extrusion-Northborough. A correlation analysis was performed to reveal the relationship between out-of-control points recorded in-process and rejected project. A time study was conducted to determine the least time consuming inspection procedures. Recommendations include the selection of particular statistical process control hardware and software system as well as improvements to inspection methods.

Publisher

Worcester Polytechnic Institute

Date Accepted

January 2005

Major

Industrial Engineering

Project Type

Major Qualifying Project

Accessibility

Restricted-WPI community only

Advisor Department

Business

Advisor Program

Business

Share

COinS