Faculty Advisor

Labonté, Robert C.

Abstract

The purpose of Power System Integrity project is to provide a means of automatically notifying Power Companies of the location of downed or sagging distribution lines. The system will consist of two components: devices that will monitor lines to detect problems, and a controller that will inform the company when and where a problem is detected. This project focused on the design of the device that will monitor the distribution lines, while specifications for the controller were contrived.

Publisher

Worcester Polytechnic Institute

Date Accepted

January 2000

Major

Electrical Engineering

Project Type

Major Qualifying Project

Accessibility

Restricted-WPI community only

Advisor Department

Electrical and Computer Engineering

Share

COinS