Abstract

This project analyzes the construction project management of the Worcester Vocational High School between July 2004 and February 2005. Project managers provided information that the MQP team analyzed to discuss the contractual structure of the project plus how information was gathered and utilized by them. Using Primavera, a schedule of the gymnasium was created to track its progress allowing for the identification of delays. A structural analysis was performed on the gym floor to determine the effects of increased loads.