This project recalculated the safe yield of the Ten Mile River Basin in the City of Attleboro, MA, and evaluated ways to enhance this yield. The Bungay River was selected to transfer water to the main reservoir within the city's supply system and evaluated as a source. A computer model was developed to estimate the safe yield and examine the effects of transferring this flow. Preliminary designs for a pump station and cost estimates were developed for this transfer.
Publisher
Worcester Polytechnic Institute
Date Accepted
January 2000
Major
Civil Engineering
Project Type
Major Qualifying Project
Copyright Statement
Access to this report is limited to members of the WPI community. Please contact a project advisor or their department to request access
Accessibility
Restricted-WPI community only
Advisor Department
Civil and Environmental Engineering