Faculty Advisor
Pietroforte, Roberto
Sponsor
Turner Construction
Abstract
This report presents a study of the fast-tracked project delivery system based on a Guaranteed Maximum Price. This delivery system is characterized by the involvement of a general contractor during the design phase of a project. The study reflects the analysis of the contractor's activities during and after this phase. The analysis was based on the review of pertinent literature, standard contracts, actual project documents, and interviews with the personnel of Turner Construction.
Publisher
Worcester Polytechnic Institute
Date Accepted
January 2001
Major
Undecided
Project Type
Major Qualifying Project
Copyright Statement
Access to this report is limited to members of the WPI community. Please contact a project advisor or their department to request access
Accessibility
Restricted-WPI community only
Advisor Department
Civil and Environmental Engineering