Student Work

Pedestrian Bridge in Institute Park using Sandwich Structured Composite

Public

Downloadable Content

open in viewer

Currently, WPI community members who reside in Salisbury Estates have no constructed path to get through Institute Park, to and from the main part of campus. This capstone project works to design a bridge between Salisbury Estates and Goddard Hall, while also investigating an alternative to a reinforced concrete slab. Excel Sheets were created to size the members through a computer application rather than through hand calculations. The sandwich structure composite alternative slab proved to reduce column size and number of reinforcements needed to hold the same load. A cost estimate was done using RSMeans and reduction in size also proved that the lightweight concrete alternative would reduce the cost of materials for the bridge.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • E-project-031419-152155
Advisor
Year
  • 2019
Date created
  • 2019-03-14
Location
  • Worcester
Resource type
Major
Rights statement

Relations

In Collection:

Items

Items

Permanent link to this page: https://digital.wpi.edu/show/mg74qn54q