Student Work

A Construction Project Management Analysis of Foisie Innovation Studio

Public

Downloadable Content

open in viewer

The owner, designer and construction managers worked collaboratively on Foisie Innovation Studio to deliver an impressive, multi-use facility in a timely, and cost-effective manner. Using the data collected during construction, this report evaluates the cost and schedule by completing an Earned Value Analysis. This report also analyzed the construction process of this project using Building Information Modeling (BIM), and identifies future potential uses of BIM and other technologies in construction. Finally, an alternative structural design for the second floor roof is proposed and its cost is determined.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • E-project-031419-142320
Advisor
Year
  • 2019
Sponsor
Date created
  • 2019-03-14
Resource type
Major
Rights statement

Relations

In Collection:

Items

Items

Permanent link to this page: https://digital.wpi.edu/show/m326m3288