Faculty Advisor

Salazar, Guillermo F.

Abstract

This project develops a 5-D Building Information Model (BIM) to visually display the gradual progress of the construction and its associated cost in the renovation of the third and fourth floors of the WPI Gateway II building, which is intended to advance healthcare technologies and launch new medical cyber-physical systems. The 5-D BIM model information is then evaluated using Earned Value Analysis to assess the project progress and performance. This project also includes the design and constructability analysis of an alternative staircase linking the two floors involved in the renovation project.

Publisher

Worcester Polytechnic Institute

Date Accepted

March 2019

Major

Civil Engineering

Project Type

Major Qualifying Project

Accessibility

Unrestricted

Advisor Department

Civil and Environmental Engineering

Share

COinS