General Electric Engine Services in Winfield, Kansas is a repair and overhaul site for the CT7 and T700 engine models. This plant desired to reduce their TAT for their midframe process from 60 to 30 days. Lean Six Sigma principles were used in order to attain this goal.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • E-project-101207-182557
Advisor
Year
  • 2007
Sponsor
Date created
  • 2007-10-12
Location
  • Winfield